The geothermal portion of our project is nearing completion and we should be fully operational by the end of the week. Today the inside portion of the coolant piping was completed. Basically two 2″ lines come into my basement data room from outside, get split into four 1.25″ lines that run out and through the ceiling of my office into the boiler room. Once in the boiler room each set of lines go into separate manifold / pump assemblies that feed each of the geothermal units independently. Several more pics are here. Tomorrow the Ecobee thermostats will be installed along with the downstairs zone controller. We should be up and running in a couple more days.
On a related note I got word yesterday from the solar contractor that we should be able to start intalling the panels in a couple of weeks or so. Stay tuned…